
My notes over a project in Quebec City
Turning End-of-Life Tyres into Energy and Raw Materials through Pyrolysis
Key References
Fundraising
Led the structuring and negotiation of the Term Sheet for Project Breath, enabling a €200 million capital raise through a joint venture between Central Lechera Asturiana and ENAGAS
Mezzanine
Advised ERCAM, a Spanish dual-axis PV tracker manufacturer, on securing working capital facilities to produce and deliver 8.5 MW of trackers for the ‘Pampa Camarones’ solar project in Chile
Consulting for a global NGO
Designing a Nature-Positive Framework for a global NGO, aimed at empowering social and environmental organisations and grid operators to drive nature- and people-positive grid expansion
Board Advisory Services
Advised SUN.CO on its corporate restructuring from an EPCM service provider to an Independent Power Producer (IPP), now operating across Latin America, Spain, and the US.
Nature-based Solutions
Develop a robust technical framework to embed Nature-Based Solutions (NbS) for climate change adaptation throughout the planning, implementation, monitoring, and evaluation phases of the Desert to Power Initiative — the world’s largest solar energy generation programme, which aims to deliver up to 10 GW of installed solar capacity by 2030 across the Sahel region
Debt restructuring
Executed a €8.7 million swap cancellation for RODASOLAR, a 2 MW feed-in tariff SPV in Albacete (Spain), restoring profitability for its shareholders.
Project Development
aised the working capital needed to take 20 MW of solar projects from greenfield to ready-to-build stage in Segovia, Seville, and Cádiz, sold to SomEnergia, Spain’s leading electric cooperative, between 2018 and 2024..
NBS and Agrivoltaics case studies

start-up in agrivoltaics
Performed a technical due diligence review for the Swiss Impact Office, a Swiss multi-family office, assessing a Greek start-up specialized in manufacturing solar glass and semi-transparent photovoltaic glass.

measuring top soil C-stocks in 15 yrs-old PV
Analyse soil erosion and compaction in a 20-year-old PV site and design measures to restore soils and boost biodiversity.